Name
4B2 - Design And Construction Of A Dike To Mitigate Pratt Stream Flooding In Coaticook: An Overview
Date
Tuesday, October 27, 2026
Time
1:30 PM - 2:50 PM
Description

To mitigate flooding from Pratt Creek in downtown Coaticook, a detention basin enclosed by an earthfill dike was constructed with more than 700 m long and 6.5 m high. Coaticook had been repeatedly affected by flooding in its downtown area, notably during the exceptional flood events of 2014 and 2015, which had a significant impact on the local community. Following the assessment of several alternatives, the selected solution includes a reinforced-concrete culvert equipped with an energy dissipation wall, designed to safely convey both normal flows and flood discharges with return periods up to 1-in-100 years. In addition, an emergency gabion spillway was incorporated at the crest of the dike to accommodate larger floods, ranging from 1:100 to 1:1,000 years, while addressing environmental constraints. The construction of the dike and associated control structures was completed within a few months, under a phased schedule tailored to meet environmental requirements and to provide flood protection to the city before the 20222023 winter season. The detention basin was officially inaugurated in September 2023. 

Location Name
Cima+ Room (501/502)
Francois Saint Pierre